Belleville History Alive!

Facade restoration nearing completion, part 2

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

REMOVE EXISTING BRICK AND LIMESTONE SILLS. STORE FOR FUTURE USE. ( TYPICAL i REMOVE TURNBUCKLE REPLACE EXISTING LIMESTONE BRACKETS WITH NEW, USING RECLAIMED STONE FROM DEMOLITION, f TYPICAL ) ^» *-- H H H REPLACE EXISTING LIMESTONE KEYSTONE WITH NEW TO MATCH ORISINAL. EXISTING LIMESTONE FACADE IS TO BE CLEANED WITH A NON-ACIDIC MASONRY CLEANER AS SPECIFIDE f TYPICAL ) REMOVE AND DISCARD EXISTING PRECAST CONCRETE SILLS AND SPANDRELS, MAKE SOOD ANY DAMAGE TO TOE SURROUWJIN6 STONE WORK. ( TYPICAL ) RELOCATED LIMESTONE SILL AMP SPANDREL TO BE FITTED INTO EXISTING OPENIN6. NOTE: CONTRACTOR HLL REMOVE ALL HRCUGHT IRON ANCHORS, NAILS BOLTS ETC- THAT DO NOT CONTRIBUTE TO THE STRUCTURAL INTEGRITY OF THE FACADE. ( TYPJ MAKE 6OOP AU. SURFACE BLEMISHES AS SPECIFIED f TYP 1 c

Powered by / Alimenté par VITA Toolkit
Privacy Policy