Durham Region Newspapers banner

Focus On Scugog (Port Perry, ON), 1 Oct 2007, p. 5

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

Lake Scugog played the lake level lottery this year: and not only:lost to.an intense drought;, but to an er- “5 ror in communication between staff within the Water < Management group at;the Trent-Severn, Waterway. _ Two logs remained out of the Lindsay dam from June 22 to July 27th, about thirty days longer than™ management indicated that they had dictated. How that happened is still.a question but what we" @ do know is that/a lot of water'left the lake even before : ee tee summer, drought Conditions set in, like vice- ~ by mistake that they were already in place: As‘of'Sept. 20 the lake was sitting at a low 249. 655. metres above sea level. (almost 2inches) lower than the ee the Trent-Sev-. ern normally drops the lake in January for the winter. It is also well below’ the set navigation level of 250 Please tum to page 12 Paintless Dent Removal Whether it's a door ding from a run-away shopping cart, minor dents or more extensive damage caused by hail, Dent Tecis exclusive Paintiess Dent Removal Process offers a convenient repair option. PDR is a highly skilled process in which minor dings and dents are from an automobile’s exterior without creating the time consuming need for traditional body shop methods. The PDR process involves custom designed dent removal tools that are applied to the inside skin of a vehicle's sheet metal, reshaping it to it's original form. AUL WEG ROS CULTS SAG (Igoe website: www.focusonscugog.com FOCUS - OCTOBER 2007 3

Powered by / Alimenté par VITA Toolkit
Privacy Policy