Oakville Beaver, 17 Jul 1994, p. 8

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

$100 OFF N NordicSport Accessory/ * Workout Wear § 3 DAYS ONLYâ€" Sun. July 17 through Tues. July 19 NordicSport in Square One Shopping Centre in Mississauga, is the leading edge in fitness /; technology featuring graphiteâ€"composite construction and the new MC2"" resistance mechanism that maximized the effectiveness of your workouts. NordicSport: The Best Value in Fitness from NordicTrack â€" * Just Got Better! 5 Get $100 Off Accessory/Workout Wear By ANGELA BLACKBURN Special to the Beaver Region stepping up pipe replacement ~alton residents, including H Oakville residents connected . to municipal water services, will likely pay 1.5 cents more per day â€" about $5 per year â€" on their 1995 water bills for watermain upgrades to ensure proper fire proâ€" tection. The accelerated program of upgrades for substandard, 100mm (4 inch) cast iron watermains, comes in the wake of a Burlington fire this spring in which firefighters couldn‘t get sufficient water from hydrants to fight a blaze. The inadequate watermains are mainly in older areas of Halton. _ Upgrades‘needed in older areas "We‘re talking oneâ€"andâ€"aâ€"half cents per day to improve the water system and fire protection in Halton Region. I don‘t think it‘s an unreaâ€" sonable increase," he said. Council will look at the issue today (Wednesday); however, Oakville councilor Stephen Sparling said, "we have no choice." He noted the water rate increase will be examâ€" ined with a view to alternative financing methods during September budget discussions. said, at a cost of less than $1 per day. Leitch said it‘s unlikely the region will find additional funds to bear the brunt of the cost. That cost is $4.6â€"million for the fiveâ€"year replacement project. About $700,000 will come from regional reserves, with the remaining money from a debenture. Halton Region has a program for substandard watermain replacement. The program is married to municipal road reconstruction. Based on counâ€" cil concerns arising from the Burlington fire, however, it will be stepped up. Originally, it would have taken 15 years to complete. It‘s now expected to be done within three Testing of flows in the area of the 100mm watermains resulted in 23 hydrants being taken out of service. Residents of Oakville and Burlington near the outâ€"ofâ€"service hydrants have been informed, by letter, receiving assurances of adequate fire protecâ€" tion to their homes. Only three hydrants were taken out of service in Halton Hills and only one in Milton. Other hydrants that were left in service, but produce low water flows, will have their bonnets paintâ€" ed white to indicate the low flow sitâ€" uation.

Powered by / Alimenté par VITA Toolkit
Privacy Policy