Independent & Free Press (Georgetown, ON), 23 Jun 2011, p. 8

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

8 Independent & Free Press,Thursday, June 23, 2011 AUDITIONS FOR GEORGETOWN LITTLE THEATRE Police blotter: Teen charged Halton Police report an Acton youth is facing a mischief under $5,000 charge after a window in a door was smashed at Acton High School about 9:40 a.m. Tuesday. Charged is Stephen Grant, 18. ··· A chain was cut, broken beer bottles were strewn around and a well cover was removed at the former Speyside School on Hwy. 25 sometime between Saturday evening and Sunday morning. ··· A Harlow BMX bicycle valued at $489 was stolen from an unlocked garage on McKinnon Ave. in Georgetown sometime between 8:30 and 9 p.m. Friday. ··· A man reports his wallet was stolen Friday while he was at the McGibbon Hotel between 11 p.m. and 12 a.m. The STUDIO SHOW Saturday, June 25 - 2:00 pm - 4:00 pm Monday, June 27 - 7:00 pm - 9:00 pm at GLT STUDIO I'm Herbert by R. Anderson and directed by Virginia Bancur; Time Flies by D. Ives and directed by Pamela Niesiobedzki-Curtis; Placid Ends at Mothballed Beginnings written and directed by Ian O'Brien. The Show Dates are September 8, 9, 10, 2011. Auditions, rehearsals and performances will take place at the GLT Studio at 33 Stewarttown Rd., Georgetown. Roles: 12 characters - 8 men and 4 women - all ages and ethnicity welcome; Prepare a short 1 minute monologue and/or cold readings. For information and to book an audition please contact info@georgetownlittletheatre.ca or by leaving a message on the phone at the studio 905-877-3422. Crews looking for well, structures Continued from pg. 4 The crews are excavating areas in block-fashion, stripping the topsoil looking for artifacts such as wells, fences, or structures. The excavation is being done by hand or machine. The soil is screened through a 6mm mesh to recover artifacts. The artifacts are gathered and documented to understand the cultural significance of the site. A minimum of 90 test pits are being dug for the Eighth Line Methodist Chapel Site and 40 to 50 are planned for the Hornby Village site. Site features are recorded to a grid and then mapped. Joseph Choi, Manager, Transportation Design and Construction Public Works, said a report will be prepared documenting the findings and submitted to the Ministry of Tourism and Culture. Depending on what's found, if it's something really significant, Choi said it could impact the timeframe of the Steeles Ave. road widening. The Region plans to widen Steeles Ave. from Trafalgar Rd. to Eighth Line N. next spring to be completed in the summer of 2013. Plans for the rest of Steeles Ave are: begin widening from James Snow Parkway to Fifth Line S. this fall-- with completion scheduled for 2013. Next up is the above-mentioned section to Eighth Line N., then Fifth Line to Trafalgar Rd. to begin in the summer of 2013, to be completed summer 2015. Eighth Line N. to Winston Churchill Blvd. is designated to be constructed in the fall 2013 with completion in summer 2015. DON'T GET PAID TIL NEXT MONTH? NO WORRIES - COME TO INSTALOANS NEED MONEY NOW? SUCH AS CTC, CPP, OLD AGE, ODSP, OW, etc. WE GIVE LOANS ON MONTHLY INCOMES 140 Guelph St., Unit 2, Georgetown 905-595-2536 DISCOVER MINUTES AWAY MILES AHEAD 905-873-1626 www.conceptford.com Delrex Blvd. 361 Guelph St. (Hwy. #7), Georgetown NCE O P C T X Guelph St. (Hwy. 7) Winston Churchill Blvd. JOHN SAYS OSE WE WON'T L A CUSTOMER OVER PRICE

Powered by / Alimenté par VITA Toolkit
Privacy Policy