Independent & Free Press (Georgetown, ON), 12 August 2021, p. 12

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

2 5 8 & g 3 Ey z = s g g = The IFP - Halton Hil theifp.ca Construction LS Co} dt fox =. Lane Shifts - Highway 401 A permanent lane shift is scheduled on Highway 401 Eastbound and Westbound from 1-kilometer West of Regional Road 25 to 1-kilometer West of Trafalgar Road for Saturday, August 14 to Sunday, August 15. The existing highway lanes will be transferred to the newly constructed lanes which will shift traffic from the interior to the new outside lanes. This traffic shift will be completed within a 14-hour period. Due to the staged nature of the work, we advise motorists to be aware of signage and changes to lane configuration throughout the corridor and to follow posted construction signage. HALTON HILLS TOWN OF MILTON ‘Kenned mous sewer @) Start Date: Saturday, August 14, 2021 End Date: Sunday, August 15, 2021 Duration: 14 Hours (10:00 PM - 12:00 PM) Ramp access will be maintained at all times. If you have any questions about upcoming work, please contact us at: a . it West Corridor 1-888-619-1665 (24 Hours) silts

Powered by / Alimenté par VITA Toolkit
Privacy Policy