Oakville Images

Oakville Beaver, 12 Oct 2017, p. 22

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

www.insidehalton.com | OAKVILLE BEAVER | Thursday, October 12, 2017 | 22 Notice of Completion GO Rail Network Electrification Transit Project Assessment Process Metrolinx and Hydro One, as co-proponents, have completed an Environmental Project Report (EPR) in accordance with Ontario Regulation 231/08 for the GO Rail Network Electrification Project. The Project As part of Regional Express Rail, Metrolinx is proposing to electrify GO-owned corridors. The GO Rail Network Electrification undertaking will entail design and implementation of a traction power supply system and power distribution components including: an Overhead Contact System (OCS) along the rail corridors, electrical feeder routes, and a number of traction power facilities located within the vicinity of the rail corridors. The Study Area (see key map) includes six GO rail corridors, as well as proposed locations for the traction power facilities (i.e., Traction Power Substations, Paralleling Stations, Switching Stations) and ancillary components: · Union Station Rail Corridor ­ UP Express Union Station to Don Yard Layover - No Traction Power Facilities · Lakeshore West Corridor ­ West of Bathurst St. (Mile 1.20) to Burlington - Including two (2) Tap locations, four (4) Traction Power Facilities, one (1) feeder route · Kitchener Corridor ­ UP Express Spur (at Highway 427) to Bramalea - Including one (1) Traction Power Facility, one (1) feeder route · Barrie Corridor ­ Parkdale Junction to Allandale GO Station - Including one (1) Tap location, four (4) Traction Power Facilities, one (1) feeder route · Stouffville Corridor ­ Scarborough Junction to Lincolnville GO Station - Including one (1) Tap location, three (3) Traction Power Facilities, one (1) feeder route · Lakeshore East Corridor ­ Don River Layover to Oshawa GO Station - Including one (1) Tap location, four (4) Traction Power Facilities, one (1) feeder route 30-Day Public Review ­ October 11 to November 9 The environmental impact of this transit project was assessed and an EPR prepared in accordance with the Transit Project Assessment Process (TPAP) as prescribed in Ontario Regulation 231/08 - Transit Projects and Metrolinx Undertakings (made under the Environmental Assessment Act). The EPR for the GO Rail Network Electrification is now available for a 30-day public review period starting October 11, 2017 on the project website (www.gotransit.com/electrification) and at the following locations: Metrolinx Head Office 97 Front Street ­ 2nd Floor Reception Toronto, ON M5J 1E6 tel: 416-874-5900 Monday to Friday: 8:30 a.m. - 4:30 p.m. Newmarket Public Library 438 Park Avenue Newmarket, ON L3Y 1W1 tel: 905-953-5110 Tuesday to Thursday: 9:30 a.m. - 9:00 p.m. Friday & Saturday: 9:30 a.m. - 5:00 p.m. Sunday: 1:00 p.m. - 5:00 p.m. Ministry of the Environment and Climate Change Central Region Office Metro Toronto District Office 5775 Yonge Street, 8th Floor North York, ON M2M 4J1 tel: 416-326-6700 Monday to Friday: 8:30 a.m. - 5:00 p.m. Downtown Barrie Public Library 60 Worsley Street Barrie, ON L4M 1L6 tel: 705-728-1010 Monday to Thursday: 9:30 a.m. - 9:00 p.m. Friday & Saturday: 9:30 a.m. - 5:00 p.m. Sunday: 12:00 p.m. - 5:00 p.m. Ministry of the Environment and Climate Change Environmental Approvals, Access and Service Integration Branch 135 St. Clair Avenue West, 1st Floor Toronto, ON M4V 1P5 tel: 416-314-8001 / toll-free: 1-800-461-6290 Monday to Friday: 8:30 a.m. - 5:00 p.m. Pickering Library Central Branch 1 The Esplanade S. Pickering, ON L1V 6K7 tel: 905-831-6265 Monday to Friday: 9:30 a.m. - 9:00 p.m. Saturday: 9:00 a.m. - 5:00 p.m. Sunday: 1:00 p.m. - 5:00 p.m.

Powered by / Alimenté par VITA Toolkit
Privacy Policy