Oakville Newspapers

Oakville Beaver, 30 Jun 2022, p. 10

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

in si de ha lto n. co m O ak vi lle B ea ve r | T hu rs da y, Ju ne 30 ,2 02 2 | 10 Interlocking & Concrete Specialists Call Mario 905.842.7171 sunmarlandscape.com ™ La n d s c a p in g 3133 Burnhamthorpe Rd W, Milton, On L9E 0J7 • Pebble Concrete • Stamped Concrete • Interlocking • Flagstone • Walkways • Garage Floors • Patios • Driveways • Curbs (French) Interlocking & Concrete Specialists Communities we serve: Located in Halton region, we work in and around • Milton • Campbellville • Burlington • Aldershot • Hamilton • Oakville • Mississauga • Waterdown • Carlisle A 29-year-old Hamilton man has been charged with arson after an Oak- ville pizzeria was allegedly set on fire Sunday, June 5. At around 1:30 a.m., that day someone approached Four Brothers Pizza on Kingsway Drive, threw a rock through a window and then threw a gas can into the restaurant, police said. The fire that followed reportedly caused around $18,000 worth of damage. Halton police conduct- ed an investigation, which resulted in a search war- rant being executed at a Hamilton residence and one arrest being made on Monday, June 20. The man has been charged with arson and possession of incendiary material. He was held in custody pending a bail hearing. The charges have not been proven in court. Anyone with informa- tion about this incident is asked to contact Halton po- lice at 905-825-4777, ext. 2216 or Crime Stoppers at 1- 800-222-TIPS (8477) or www.haltoncrimestopper- s.ca. ARSON CHARGE LAID IN PIZZERIA FIRE CRIME An agreement has been reached that will keep costs down for two munici- palities. At the June 21 Burling- ton city council meeting, council agreed to a revised financial framework for cost-sharing, delivery and maintenance of the Bur- loak Grade Separation project with Metrolinx that would see Burlington and Oakville spending $15 million each on the pro- ject. Once complete, the project would see the con- struction of a road-under- rail underpass at the cur- rently at-grade train crossing on Burloak Drive. In 2018 all parties agreed on a capped cost share, of 50 per cent Metro- linx and 25 per cent each for Burlington and Oak- ville, for a total project cost of $60 million. Howev- er, earlier this year, Metro- linx informed the City of Burlington and the Town of Oakville that the total project cost was $177 mil- lion and each municipality would need to pay $45 mil- lion each. Following discussions, the financial ask of the City of Burlington for this project was then reduced to the original agreed-up- on cost of $15 million. Scott Hamilton, direc- tor of engineering servic- es, said the project will have numerous benefits. "We're very happy to re- duce the costs back to our original agreed-upon $15 million for this project. Once complete, this grade separation will signifi- cantly reduce congestion and greenhouse gas emis- sions by not having vehi- cles stopped at the rail line crossing, waiting for the train to pass. It will also make the crossing much safer for all users by virtu- ally eliminating most risks of collisions with on- coming trains," said Ham- ilton. Part of the updated sav- ings for this cost-sharing agreement comes from a planned 12-month road closure of Burloak Drive and previously agreed to credit for works completed by Burlington in advance of this project. Burlington mayor Mar- ianne Meed Ward said this is the result of work from the city's government rela- tions and technical staff. "I especially want to thank Ward Councillor Paul Sharman on this. Our joint advocacy does pay off, and this is just one ex- ample, where we worked together to protect our taxpayers and ensure the agency responsible for cost overruns absorbed the cost," said Meed Ward. GO Transit's planned 15-minute all-day service for 2025, will see up to eight trains crossing Burloak Drive every hour, in addi- tion to regular VIA and freight trains. The Burloak Drive clo- sure will be from July 2026 to August 2027. BURLOAK GRADE SEPARATION PROJECT COST STILL $15 MILLION ROLAND CILLIERS rcilliers@metroland.com NEWS METROLINX HAD PREVIOUSLY TOLD CITIES THAT PROJECT COST HAD INCREASED TO $45 MILLION FOR EACH MUNICIPALITY "We're very happy to reduce the costs back to our original agreed upon $15 million for this project." - Scott Hamilton The Burloak project will be four-lane with provisions to be a six-lane road in the future. Metrolinx illustration

Powered by / Alimenté par VITA Toolkit
Privacy Policy