Ordinance, msrh_00252_p2.jpg

The following text may have been generated by Optical Character Recognition, with varying degrees of accuracy. Reader beware!

to number from East to West from Number One to Twelve inclusive and the Concessions from South to North from One to Six inclusive. The Concession lines are to be run due East and West, astronomically and the side lines at right angles thereto or due North and South, astronomically. The lines to be surveyed are marked in Red on the projected Plan. You will commence the Survey at the South East angle of the Township which is also the South West angle of Bagerow & North West angle of Caldwell, by running due West for the front of your first Concession, planting your posts at regular intervals thereon. In performing the Survey, your lines must be well opened and blazed and will plant firmly in the ground at the front angles of the lots, dividable land Substantial posts of the dimensions given in the "General Instructions" taking care to mark with a proper Marking Tool the number of the lots on the East and West sides thereof and the number of the Concession on the North Side thereof, the Concession, being Single fronted, you will not mark on the South Side of the post between lots one and two, three and four, five and six in any of the Concession as these posts have no relevance to the lots South of them, but form the starting point for there respective side lines which will be drawn parallel to their Several governing lines. You will not lay out any Concession or Side road allowances. In those parts of Concessions which front on Lakes, you will be Careful to plant the posts at the proper points along the shore. You will obtain, by calculation, or offsets, int he field all width of lakes, rivers cut by your Concessions or side lines run by you which cannot be measured in the same way and report the same in your Field book on the page on which it occurs in order that a Satisfactory check of your work may be made in this office. All waters within the limits of your Survey must be Surveyed and connected with your lines of Survey, whether such waters are cut by the concession or Side lines run by you or not. In carrying out this Survey you will conform closely with the "General Instruction" a copy of which is herewith enclosed for your guidance. In the copy of your Field Notes which you sent to the Department along with your Returns of Survey, you

Powered by / Alimenté par VITA Toolkit
Privacy Policy