Six Nations Public library - Digital Archive

"Enbridge oil pipeline over Grand could devastate Six Nations water"

Publication
Two Row Times (Six Nations of the Grand River, ON), 13 May 2015
Description
Full Text
Enbridge oil pipeline over Grand could devastate Six Nations water
By Mari Reeve

OHSWEKEN - Approximately 50 people gathered at the GREAT Theatre to hear information about Enbridge's Line 9 - which runs through Six Nations territory.

Line 9 begins in Aamjiwnaang First Nation, otherwise known as Sarnia, and ends in Montreal. In June, Enbridge plans for Line 9B to begin pumping toxic diluted bitumen through the pipeline all the way to Montreal.

A Line 9 pipeline spill would affect over 9 million people along the pipeline, possibly polluting over 100 communities from small towns to large urban centres like Toronto. Presenters at the event said that 18 of those communities are indigenous territories and 11 of these First Nations communities were ignored with no prior, informed consent of the toxic materials that will flow across their lands.

Speakers at the event shared that according to Enbridge's own inspection tools there are 12,961 findings of cracks, dents, or corrosion damages along the pipeline. There have been obvious warning signs and red flags. Like the current record of 35 pipeline ruptures over 40 years of Line 9's existence, or Enbridge's pipeline 6B spill in July of 2010.

Line 6B, which is almost identical to Line 9 in age, construction, and operation, burst and contaminated the Talmadge River in Minnesota. Diluted bitumen from tar sands flowed from a six foot break in the pipeline in what was recorded as the biggest inland oil spill in US history.

Bitumen rolled down the Talmadge and into the Kalamazoo River in Michigan. Presenters of this week's event confirmed that even today, five years later, Enbridge's clean up from that spill is not yet complete and there have been no public reports or government efforts to inform the people of the ongoing environmental and health effects of the spill.

There has been vocal community resistance all along Line 9, such as an occupation of sites that cross the Grand River, one action even leading to 6 arrests in Westover. Still Line 9 and many other pipelines continue to operate daily and are in the process of being built.

Considering the track record of these pipelines protestors have a strong argument. A 'pipeline for the economy now, worry about the consequences after' mentality leaves water, food and land security at high risk. Why spend money protecting the water or land?

Presenters also shared that there is also no Canadian government agency or department that is responsible for cleaning up the environmental disasters. And there is little known about the process of oil spill clean up. This means that there is likely no action plan in place to protect the Grand River from an environmental disaster much like the Talmadge River.


Creator
Reeve, Mari, Author
Media Type
Text
Newspaper
Item Type
Clippings
Publisher
Two Row Times
Place of Publication
Six Nations of the Grand River, ON
Date of Publication
13 May 2015
Subject(s)
Corporate Name(s)
Grand River Employment and Training ; Enbridge Inc. ; Government of Canada.
Local identifier
SNPL004473v00d
Language of Item
English
Geographic Coverage
  • Ontario, Canada
    Latitude: 43.06681 Longitude: -80.11635
Creative Commons licence
Attribution-NonCommercial [more details]
Copyright Statement
Public domain: Copyright has expired according to Canadian law. No restrictions on use.
Copyright Date
2015
Copyright Holder
Two Row Times
Contact
Six Nations Public Library
Email:info@snpl.ca
Website:
Agency street/mail address:
1679 Chiefswood Rd
PO Box 149
Ohsweken, ON N0A 1M0
519-445-2954
Powered by / Alimenté par VITA Toolkit
Privacy Policy